We Offer

Aviation Ground Fueling System

Viziocon's team has been, at the forefront of developing aviation ground fueling solutions for use for years.

We offer solutions for fuel systems covering everything from design and engineering to procurement, testing and commissioning. Our skilled team collaborates closely with our clients to tailor the system to their requirements and ensure it meets top notch standards.
Fuel hydrant systems have been widely adopted by airports globally leading to safety and reduced congestion. Our systems are meticulously designed to comply with industry regulations and standards prioritizing safety and reliability.

Our services include;

Designing and engineering of fuel systems, procuring equipment and materials, constructing and installing fuel hydrant systems, testing and commissioning, and providing maintenance and support

Our team comprises seasoned professionals well versed in aviation fueling systems. We leverage cutting edge technology and equipment to deliver effective and secure solutions.
At Viziocon we are dedicated, to delivering top tier service and assistance to our valued clients.
We value establishing lasting connections, with our customers striving to guarantee the durability, effectiveness and safety of their fuel system for years.

District Cooling & Energy Transfer

In any district cooling project the design and engineering play a role in determining how efficient and effective the system will be. Procurement is equally important to ensure that top quality components are used, leading to reliability and reduced maintenance expenses.

Testing and commissioning are steps, in guaranteeing that the district cooling system operates as planned and delivers the expected outcomes. Energy storage and energy transfer stations are also elements of a district cooling setup aiding in optimizing energy usage and cutting down on expenses.

Viziocon is well prepared to handle various district cooling projects covering everything from design and engineering, to commissioning and ongoing maintenance.

HVAC

Having a team of experts is crucial, for managing every phase of the HVAC project starting from planning to implementation. This guarantees the installation of the system and its optimal performance thereby reducing the likelihood of maintenance problems.

Viziocon possesses the skills to manage all facets of HVAC projects and offers clients an approach, for installing or enhancing their HVAC systems.

Commissioning Managemnt

Viziocon's Commissioning Management team can bring expertise and support to any project team offering assistance across commissioning related areas.

It is essential to manage installations during the commissioning phase to ensure adherence, to the project plan and correct system installation. This practice can mitigate delays. Guarantee that the system is operational as required for commissioning.

Conducting design reviews plays a role in commissioning by pinpointing issues or areas for enhancement before full system operation. This process aims to optimize system performance and energy efficiency.

Effective programme production is integral to successful commissioning management ensuring that all aspects of the process are meticulously planned and carried out on schedule.

Building surveys are crucial for identifying any challenges or issues that could impact the commissioning process, such as construction or faulty equipment. This proactive approach helps preempt delays or complications during commissioning.

By employing management and meticulous planning services can be brought online in readiness, for commissioning with any emerging issues promptly identified and resolved before they escalate.In the end explaining the commissioning procedure, to the client can establish trust. Boost their confidence, in their investment. This ensures that the system functions efficiently and receives maintenance throughout its lifespan.

In general Viziocon's Commissioning Management team offers assistance to project teams during the commissioning phase. They guarantee installation, performance optimization and full operation of the system before it is commissioned.

Our Projects

  1. Location: Abu Dhabi Project Description: Design, supply, and installation of Energy Transfer Station piping works, including the installation of eight heat exchanger plates and all required valve packages, as well as electrical and instrumentation work on the primary side.
  2. Location: Dubai Project Description: Supply and installation of a complete chilled water system for a shopping mall, including chillers and pumps.
  3. Location: Dubai Project Description: Fabrication, installation, and welding of underground chilled water network piping up to 42" in diameter of pre-insulated carbon steel pipe and fittings.
  4. Location: Dubai Project Description: Ground Support Airport Equipment Engineering, Installation, and Testing Commissioning.
  5. Location: Jebel Ali Project Description: Ground Support Airport Equipment Engineering, Installation, and Testing Commissioning.
  6. Location: Abu Dhabi Project Description: Supply and installation of an energy transfer station (primary side) and a chilled water piping network for two residential towers (MEERA).
  7. Location: Bahrain Project Description: Engineering Works for the Airport's Fuel Farm and Fuel Hydrant System (Aviation).
  8. Location: Al Ain Project Description: Supply, Installation, Testing Commissioning of PCA Units with Chilled Water Piping and Electrical Works (Ground Support Equipment).
  9. Location: Dubai Project Description: Fabrication, Fit Up and Welding of CHW Underground Piping up to 48" Dia of Pre Insulated CSPipe & Fittings.
  10. Location: Dubai Project Description: Fabrication, Installation of Energy Transfer Station (Primary Side) and Pump Room with Chilled Water Piping Network for Residential Towers (One JBR).
  11. Location: Sharjah Project Description: Fabrication and installation of Chilled Water Piping Networks in the Pump Room, Second Floor, and Roof Floor, as well as the installation of 220 Fan Coil Units with Piping and Accessories for Al Zahia City Center.
  12. Location: Dubai Project Description: Design, Supply & Installation of Chilled Water Pre-insulated Underground Piping & ETS/Pump Room Works for Labour Camp.
  13. Location: Sharjah Project Description: Management of Testing & Commissioning works for Al Zahia City Centre.
  14. Location: Cebu-Philippines Project Description: Complete Testing & Commissioning works for Fuel Hydrant System at Cebu Mactan International Airport.
  15. Location: Abu Dhabi Project Description: Supply and installation of piping works for an energy transfer station, including the installation of three heat exchanger plates with all needed valve packages on the primary side.
  16. Location: Dubai Project Description: Engineering, Supply, Fabrication, and Welding of Pre Insulated Pipes with Flow Stops, as well as Hot Tapping and Flushing works for the Bollywood Expansion Project at Dubai Parks & Resorts.
  17. Location: Abu Dhabi Project Description: Supply and installation of piping works for an energy transfer station, including the installation of four heat exchanger plates with all needed valve packages on the primary side.
  18. Location: Al Ain Project Description: Engineering, Supply, and Installation of 2 Nos. Steam Boilers 2112 Kw Heat Output with Hot Water Calorifier 5000 Ltrs Storage Capacity with Tanks and Accessories Including subterranean steam water, diesel, and condensation pipe works.
  19. Location: Abu Dhabi Project Description: Modification, supply, and installation of new valves (DRVs and Gate Valves) and accessories for the Pump Room at the Carrefour Abu Dhabi Marina Mall.
  20. Location: Dubai Project Description: Fabrication, Fit-up, and Welding of Steel Spine and Fin Piping and Cover Plates at Dubai Harbour.
  21. Location: Al Ain Project Description: engineering, supply, and installation of underground preinsulated steam piping works with all relevant accessories and above ground steam pipe with valves for boilers for a hotel.
  22. Location: Sharjah Project Description: Construction of New Remote Aircraft Hardstand Aprons, Related Taxiways, and Associated Airport Works for DJ-279 Piping Fabrication, Fit-up, Welding, and Installation Works.
  23. Location: Dubai Project Description: Design, supply, and installation of CHW Pumps, Secondary and Primary Side Piping, and Valve Packages with Underground Piping for a Factory's New ETS Room.
  24. Location: Al Ain Project Description: Supply and installation of 410 meters of heavy duty storage racks for the airport.
  25. Location: Al Ain Project Description: HVAC Complete Works, IT, Steel Caging Works, and Medium Duty Storage Racks for airport design, supply, and installation.
  26. Location: Abu Dhabi Project Description: 575 Junction Box hot dip galvanised steel frames were designed, manufactured, and supplied.
  27. Location: Abu Dhabi Project Description: Design, supply, and manufacturing of 59 solar steel structures (3 panels and 4 panels).
  28. Location: Abu Dhabi Project Description: Design, Fabrication, and Supply of 18,000 Ltrs Cylindrical Diesel Tank with all Necessary Accessories and Valves at KIZAD.
  29. Location: Abu Dhabi Project Description: Design, fabrication, and supply of two (2) heavy-duty trailers for Soluforce coil pipes.
  30. Location: Dubai Project Description: Villa A17-Complete HVAC Works (VRV System) Design, Supply, and Installation for B+G+1+R Luxury Residential Villa in Jumeirah Bay.
  31. Location: Abu Dhabi Project Description: Supply and Installation of New 3 Ton Ducted Type FCU's for Carrefour Hypermarket.
  32. Location: Dubai Project Description: Villa A14-Complete HVAC Works (VRV System) Design, Supply, and Installation for B+G+1+R Luxury Residential Villa in Jumeirah Bay.